← Back to Derbyshire

Solar · United Kingdom

The Breck

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational5 MWData checked 16 November 2026Source record dated 18 August 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

The Breck is a 5 MW solar farm on the edge of Staveley, Derbyshire, United Kingdom. Its planning application (CHE/15/00460/FUL) went to Chesterfield on 31 July 2015 and was granted on 27 October 2015. It has been operating since 17 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 62 other energy sites within 10 km, 36 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 564 energy sites within 40 km for The Breck

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
The Breck, Breck Lane, Barrow Hill, Chesterfield, Derbyshire, S43 2NP, United Kingdom
Planning authority
Chesterfield
Planning application
CHE/15/00460/FUL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CHE/15/00460/FUL, with what the planning evidence pack adds for this site.

Every application in Chesterfield · Alerts for applications and incidents near here

  • 31 July 2015 Planning application submitted
  • 27 October 2015 Planning permission granted
  • 1 February 2016 Construction started
  • 17 March 2016 Operational

None found. The register holds no published incident that names The Breck. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has The Breck had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names The Breck; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of The Breck?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 August 2016.
Where is The Breck?
On the edge of Staveley, Derbyshire, United Kingdom (postcode S43 2NP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).