Onshore wind · United Kingdom
Talladh-a-Bheithe Wind Farm
Operator Eventus Duurzaam
Application Withdrawn75 MWData checked 16 November 2026Source record dated 3 November 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Talladh-a-Bheithe Wind Farm is a 75 MW wind farm 48 km east of Fort William, Tayside, United Kingdom. Its planning application went to Scottish Government (S36) on 23 June 2014 and was withdrawn on 30 October 2015. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There is one other energy site within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Talladh-a-Bheithe Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 75 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- Eventus Duurzaam
- Location
- Craiganour Estate 9km North-West of Kinloch Rannoch and 22km South of Dalwhinnie, Tayside, United Kingdom
- Planning authority
- Scottish Government (S36)
- Turbines
- 24
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 23 June 2014 Planning application submitted
- 30 October 2015 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Talladh-a-Bheithe Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Talladh-a-Bheithe Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Talladh-a-Bheithe Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Talladh-a-Bheithe Wind Farm?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 3 November 2015.
- Where is Talladh-a-Bheithe Wind Farm?
- 48 km east of Fort William, Tayside, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).