Solar · United Kingdom
Blair Castle Caravan Park, Blair Atholl - Solar Farm
Operator Atholl Estates
Operational0.2 MWData checked 16 November 2026Source record dated 28 July 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Blair Castle Caravan Park, Blair Atholl - Solar Farm is a 0.2 MW solar farm 36 km north-west of Blairgowrie and Rattray, Tayside, United Kingdom. Its planning application (23/00716/FLL) went to Perth and Kinross on 12 June 2023 and was granted on 25 July 2023. It has been operating since 1 May 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There is one other energy site within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Blair Castle Caravan Park, Blair Atholl - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Atholl Estates
- Location
- Blair Castle Caravan Park, Blair Atholl, Pitlochry, Tayside, PH18 5SR, United Kingdom
- Planning authority
- Perth and Kinross
- Planning application
- 23/00716/FLL
- First operating
- 2023
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/00716/FLL, with what the planning evidence pack adds for this site.
Every application in Perth and Kinross · Alerts for applications and incidents near here
Timeline
- 1 February 2023 Construction started
- 1 May 2023 Operational
- 12 June 2023 Planning application submitted
- 25 July 2023 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Blair Castle Caravan Park, Blair Atholl - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Blair Castle Caravan Park, Blair Atholl - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Blair Castle Caravan Park, Blair Atholl - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Blair Castle Caravan Park, Blair Atholl - Solar Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 July 2023.
- Where is Blair Castle Caravan Park, Blair Atholl - Solar Farm?
- 36 km north-west of Blairgowrie and Rattray, Tayside, United Kingdom (postcode PH18 5SR).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).