Onshore wind · United Kingdom
Griffin Wind farm
Operator Greenpower (Griffin) Ltd
Operational156 MWData checked 16 November 2026Source record dated 29 February 2012
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Griffin Wind farm is a 156 MW wind farm 24 km north of Crieff, Tayside, United Kingdom. Its planning application went to Scottish Government (S36) on 27 April 2004 and was granted on 31 January 2008. It has been operating since 28 February 2012. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 5 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Griffin Wind farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
29 settled days to 4 Nov: 8,548 MWh, running 65% of half hours, peak 44 MW of 156, load factor 8%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.
A day out costs this site about £83,754 at its earnings over the last 29 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The site
- Technology
- Onshore wind
- Capacity
- 156 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Greenpower (Griffin) Ltd
- Location
- Griffin Forest, Tayside, United Kingdom
- Planning authority
- Scottish Government (S36)
- First operating
- 2012
- Turbines
- 52
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 27 April 2004 Planning application submitted
- 31 January 2008 Planning permission granted
- 1 July 2010 Construction started
- 28 February 2012 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Griffin Wind farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Griffin Wind farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Griffin Wind farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Griffin Wind farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 29 February 2012.
- Where is Griffin Wind farm?
- 24 km north of Crieff, Tayside, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).