Battery storage · United Kingdom

Killin Switching Station, Boreland - Boreland Energy Storage Park

Operator Boreland Energy Limited

Awaiting Construction43 MWData checked 16 November 2026Source record dated 7 October 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Killin Switching Station, Boreland - Boreland Energy Storage Park is a 43 MW battery storage site 32 km west of Crieff, Tayside, United Kingdom. Its planning application (25/00246/FUL) went to Stirling on 30 April 2025 and was granted on 8 September 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 2 other energy sites within 10 km. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Killin Switching Station, Boreland - Boreland Energy Storage Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 355 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool355 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells426 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire552 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
43 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Boreland Energy Limited
Location
E/O Killin Switching Station, Boreland, Glen Lochay, Killin, Tayside, FK21 8TT, United Kingdom
Planning authority
Stirling
Planning application
25/00246/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/00246/FUL, with what the planning evidence pack adds for this site.

Every application in Stirling · Alerts for applications and incidents near here

  • 30 April 2025 Planning application submitted
  • 8 September 2025 Planning permission granted
  • 8 September 2028 Planning permission runs out

None found. The register holds no published incident that names Killin Switching Station, Boreland - Boreland Energy Storage Park. If you know of one, report it (confidential reports are anonymised).

Has Killin Switching Station, Boreland - Boreland Energy Storage Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Killin Switching Station, Boreland - Boreland Energy Storage Park; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Killin Switching Station, Boreland - Boreland Energy Storage Park?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 October 2025.
Where is Killin Switching Station, Boreland - Boreland Energy Storage Park?
32 km west of Crieff, Tayside, United Kingdom (postcode FK21 8TT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).