← Back to Cleveland

Solar · United Kingdom

Stob House Farm

Operator Anesco · Owner Quanesco Midco Limited

Operational4.9 MWData checked 16 November 2026Source record dated 22 December 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Stob House Farm is a 4.9 MW solar farm 5 km north of Billingham, Cleveland, United Kingdom. Its planning application (H/2015/0315) went to Hartlepool on 10 September 2015 and was granted on 22 January 2016. It has been operating since 1 September 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 87 other energy sites within 10 km, 44 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 63 other sites and 384 energy sites within 40 km for Stob House Farm

Members see the sites and incidents around this one, and every record behind them.

ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
4.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Anesco
Owner
Quanesco Midco Limited
Location
Land North of Wolviston, Newton Bewley, Billingham, Cleveland, TS22 5, United Kingdom
Planning authority
Hartlepool
Planning application
H/2015/0315
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for H/2015/0315, with what the planning evidence pack adds for this site.

Every application in Hartlepool · Alerts for applications and incidents near here

  • 10 September 2015 Planning application submitted
  • 22 January 2016 Planning permission granted
  • 1 July 2016 Construction started
  • 1 September 2016 Operational

None found. The register holds no published incident that names Stob House Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Stob House Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Stob House Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Stob House Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 22 December 2016.
Where is Stob House Farm?
5 km north of Billingham, Cleveland, United Kingdom (postcode TS22 5).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).