Planning pack for this site, £295Other options

Battery storage · United Kingdom

Stainland Energy Storage Project

Operator Whirlwind Energy Storage Limited

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 14 January 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Stainland Energy Storage Project is a 49.9 MW battery storage site on the edge of Thurso, Highland, United Kingdom. Its planning application (22/02054/FUL) went to Highland on 23 May 2022 and was granted on 4 November 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 19 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

WHIRLWIND ENERGY STORAGE LIMITED (12314124), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Stainland Energy Storage Project sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 577 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool577 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells624 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire769 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Whirlwind Energy Storage Limited
Location
E/O The A9 N/O Upper Geiselittle Thurso, Highland, KW14 8YH, United Kingdom
Planning authority
Highland
Planning application
22/02054/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/02054/FUL, with what the planning evidence pack adds for this site.

Every application in Highland · Alerts for applications and incidents near here

  • 23 May 2022 Planning application submitted
  • 4 November 2022 Planning permission granted
  • 4 November 2027 Planning permission runs out

None found. The register holds no published incident that names Stainland Energy Storage Project. If you know of one, report it (confidential reports are anonymised).

Has Stainland Energy Storage Project had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Stainland Energy Storage Project; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Stainland Energy Storage Project?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 14 January 2025.
Where is Stainland Energy Storage Project?
On the edge of Thurso, Highland, United Kingdom (postcode KW14 8YH).