← Back to Highland

Battery storage · United Kingdom

Kirkton Energy Farm

Operator Kirkton Wind Farm Limited

Application Refused20 MWData checked 16 November 2026Source record dated 8 May 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Kirkton Energy Farm is a 20 MW battery storage site on the edge of Thurso, Highland, United Kingdom. Its planning application (ECU00003244) went to Scottish Government (S36) on 9 November 2022 and was refused on 23 January 2026. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 24 other energy sites within 10 km, 6 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 1 other site and 134 energy sites within 40 km for Kirkton Energy Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Co-located with RE)
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Kirkton Wind Farm Limited
Location
1800M SW Of Kirkton Cemetery, Melvich, Highland, KW14, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00003244

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00003244, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 9 November 2022 Planning application submitted
  • 23 January 2026 Planning permission refused

None found. The register holds no published incident that names Kirkton Energy Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Kirkton Energy Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kirkton Energy Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Kirkton Energy Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 8 May 2026.
Where is Kirkton Energy Farm?
On the edge of Thurso, Highland, United Kingdom (postcode KW14).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).