Awaiting Construction60 MWChecked 6 October 2026Last changed in the dataset 15 July 2025

Technology
Battery storage (Stand-alone Storage)
Capacity
60 MW
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Whirlwind Energy Storage Limited
Location
East of the West Boldon Substation, 400 metres south of the A184 and 300m East of the A189 in South Tyneside, Tyne And Wear, NE35 9PE, United Kingdom
Planning authority
South Tyneside
Planning application
ST/0486/23/FUL
Appeal reference
APP/A4520/W/24/3350689

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 17 July 2023 Planning application submitted
  • 21 June 2024 Planning permission refused
  • 20 September 2024 Appeal lodged
  • 10 December 2024 Planning permission granted
  • 10 December 2024 Appeal granted
  • 10 December 2027 Planning permission expired

None found. The register holds no published incident that names West Boldon Substation - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

The register holds 14 incidents at battery storage sites in the United Kingdom, 9 of them fires, and 176 worldwide. Counts of incidents in published reporting, not rates.

What fails at battery storage sites · All battery storage incidents

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack sets out every comparable incident for one project, with sources. £295, by email in minutes.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.