Solar · United Kingdom

Nissan Test Track

Operator Nissan & On-Site Land Solutions

Operational4.8 MWData checked 16 November 2026Source record dated 17 June 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Nissan Test Track is a 4.8 MW solar farm on the edge of The Boldons, Tyne and Wear, United Kingdom. Its planning application (15/00942/FUL) went to Sunderland on 3 May 2015 and was granted on 22 July 2015. It has been operating since 30 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 97 other energy sites within 10 km, 68 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

436 energy sites within 40 km for Nissan Test Track

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
4.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Nissan & On-Site Land Solutions
Location
Nissan Test Track, Washington Road, Nissan Motor Manufacturing (UK, Sunderland, Tyne and Wear, Tyne and Wear, SR5 3NS, United Kingdom
Planning authority
Sunderland
Planning application
15/00942/FUL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/00942/FUL, with what the planning evidence pack adds for this site.

Every application in Sunderland · Alerts for applications and incidents near here

  • 3 May 2015 Planning application submitted
  • 22 July 2015 Planning permission granted
  • 30 January 2016 Construction started
  • 30 March 2016 Operational

None found. The register holds no published incident that names Nissan Test Track. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Nissan Test Track had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Nissan Test Track; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Nissan Test Track?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 17 June 2016.
Where is Nissan Test Track?
On the edge of The Boldons, Tyne and Wear, United Kingdom (postcode SR5 3NS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).