Solar · United Kingdom
Special Melted Products, President Way Works - Solar Panels
Operator Special Melted Products Limited
Awaiting Construction1 MWData checked 16 November 2026Source record dated 4 April 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Special Melted Products, President Way Works - Solar Panels is a 1 MW solar farm in Burngreave, South Yorkshire, United Kingdom. Its planning application (23/00253/PVPN) went to Sheffield on 27 January 2023 and was granted on 23 March 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 71 other energy sites within 10 km, 33 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Special Melted Products, President Way Works - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Special Melted Products, President Way Works - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 32 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1552 | 2023 | Fire starts in solar panels on commercial roof in Doncaster | 32 km | Significant |
| EIR-2771 | 2024 | Fire involves rooftop solar panels and lithium batteries on Bradford house roof | 46 km | Minor |
| EIR-1485 | 2026 | Faulty solar panel wiring sparks house fire in Stoke-on-Trent | 60 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Special Melted Products Limited
- Location
- Special Melted Products Ltd President Way Works President Way, South Yorkshire, S4 7UR, United Kingdom
- Planning authority
- Sheffield
- Planning application
- 23/00253/PVPN
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/00253/PVPN, with what the planning evidence pack adds for this site.
Every application in Sheffield · Alerts for applications and incidents near here
Timeline
- 27 January 2023 Planning application submitted
- 23 March 2023 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Special Melted Products, President Way Works - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Special Melted Products, President Way Works - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Special Melted Products, President Way Works - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Special Melted Products, President Way Works - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 April 2023.
- Where is Special Melted Products, President Way Works - Solar Panels?
- In Burngreave, South Yorkshire, United Kingdom (postcode S4 7UR).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).