Battery storage · United Kingdom

Petre Street

Operator Renewable Energy Systems (RES) · Owner Supernova Power (Holdco 2) Limited

Planning Permission Expired20 MWData checked 16 November 2026Source record dated 25 June 2020

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Petre Street is a 20 MW battery storage site in Burngreave, South Yorkshire, United Kingdom. Its planning application (16/03302/FUL) went to Sheffield on 5 September 2016 and was granted on 24 November 2017. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 70 other energy sites within 10 km, 22 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 80 other sites and 570 energy sites within 40 km for Petre Street

Members see the sites and incidents around this one, and every record behind them.

SUPERNOVA POWER (HOLDCO 2) LIMITED (13091546), active, since 2020. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Renewable Energy Systems (RES)
Owner
Supernova Power (Holdco 2) Limited
Location
Site Of 350 Petre Street, Sheffield, South Yorkshire, S4 8LU, United Kingdom
Planning authority
Sheffield
Planning application
16/03302/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 16/03302/FUL, with what the planning evidence pack adds for this site.

Every application in Sheffield · Alerts for applications and incidents near here

  • 5 September 2016 Planning application submitted
  • 24 November 2017 Planning permission granted
  • 4 November 2019 Planning permission expired

None found. The register holds no published incident that names Petre Street. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Petre Street had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Petre Street; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Petre Street?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 25 June 2020.
Where is Petre Street?
In Burngreave, South Yorkshire, United Kingdom (postcode S4 8LU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).