Planning pack for this site, £295Other options

Solar · United Kingdom

Sytner BMW Sheffield, Brightside Way - Solar Panels

Operator Sytner Group Limited · Owner Pag International Limited

Awaiting Construction1 MWData checked 16 November 2026Source record dated 13 January 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Sytner BMW Sheffield, Brightside Way - Solar Panels is a 1 MW solar farm on the edge of Burngreave, South Yorkshire, United Kingdom. Its planning application (25/03219/PVPN) went to Sheffield on 28 October 2025 and was granted on 15 December 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 75 other energy sites within 10 km, 34 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

SYTNER GROUP LIMITED (02883766), active, since 1993. 10 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Sytner BMW Sheffield, Brightside Way - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 30 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster30 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof45 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent61 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Sytner Group Limited
Owner
Pag International Limited
Location
Sytner BMW Sheffield Brightside Way, South Yorkshire, S9 2RQ, United Kingdom
Planning authority
Sheffield
Planning application
25/03219/PVPN

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/03219/PVPN, with what the planning evidence pack adds for this site.

Every application in Sheffield · Alerts for applications and incidents near here

  • 28 October 2025 Planning application submitted
  • 15 December 2025 Planning permission granted

None found. The register holds no published incident that names Sytner BMW Sheffield, Brightside Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Sytner BMW Sheffield, Brightside Way - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Sytner BMW Sheffield, Brightside Way - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Sytner BMW Sheffield, Brightside Way - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 January 2026.
Where is Sytner BMW Sheffield, Brightside Way - Solar Panels?
On the edge of Burngreave, South Yorkshire, United Kingdom (postcode S9 2RQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).