Solar · United Kingdom
Solar Farm Development in Ballymena
Operator Brooklands Altnagelvin No2 Limited
Awaiting Construction3.5 MWData checked 16 November 2026Source record dated 6 May 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Solar Farm Development in Ballymena is a 3.5 MW solar farm 3.2 km east of Ballymena, Co. Antrim, United Kingdom. Its planning application (LA02/2024/0932/F) went to Mid and East Antrim on 18 December 2024 and was granted on 14 April 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 23 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Solar Farm Development in Ballymena changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Solar Farm Development in Ballymena sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0752, Storm Darragh damages newly commissioned Anglesey solar farm panels, 215 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0752 | 2024 | Storm Darragh damages newly commissioned Anglesey solar farm panels | 215 km | Significant |
| EIR-1400 | 2023 | Solar panel and battery fire at a bungalow on Anglesey | 216 km | Minor |
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 220 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 3.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Brooklands Altnagelvin No2 Limited
- Location
- Lands to North West of 90 Woodside Road, Ballymena, Co. Mid & East Antrim, Co. Antrim, BT42 4QH, United Kingdom
- Planning authority
- Mid and East Antrim
- Planning application
- LA02/2024/0932/F
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LA02/2024/0932/F, with what the planning evidence pack adds for this site.
Every application in Mid and East Antrim · Alerts for applications and incidents near here
Timeline
- 14 April 2013 Planning permission expired
- 18 December 2024 Planning application submitted
- 14 April 2025 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Solar Farm Development in Ballymena. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Solar Farm Development in Ballymena had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Solar Farm Development in Ballymena; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Solar Farm Development in Ballymena?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 May 2025.
- Where is Solar Farm Development in Ballymena?
- 3.2 km east of Ballymena, Co. Antrim, United Kingdom (postcode BT42 4QH).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).