Onshore wind · United Kingdom
Slieve Kirk
Operator Scottish and Southern Energy (SSE)
Operational27.6 MWData checked 16 November 2026Source record dated 25 January 2012
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Slieve Kirk is a 27.6 MW wind farm 8.7 km south of Derry, Co. Tyrone, United Kingdom. Its planning application (A/2004/1130/F) went to Derry City and Strabane on 29 October 2004 and was granted on 10 March 2009. It has been operating since 1 October 2011. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 17 other energy sites within 10 km, 12 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Slieve Kirk changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 27.6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Scottish and Southern Energy (SSE)
- Location
- Lands bounded by Bigwood Road, Kildoag Road & Castlewarren Road, within the townlands of Lisdillon, Kildoag in Co Derry, Knockbrack, Gosheden, Lackagh, Ardground, Legagh in Co Tyrone, Co. Tyrone, United Kingdom
- Planning authority
- Derry City and Strabane
- Planning application
- A/2004/1130/F
- First operating
- 2011
- Turbines
- 12
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for A/2004/1130/F, with what the planning evidence pack adds for this site.
Every application in Derry City and Strabane · Alerts for applications and incidents near here
Timeline
- 29 October 2004 Planning application submitted
- 10 March 2009 Planning permission granted
- 1 April 2011 Construction started
- 1 October 2011 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Slieve Kirk. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Slieve Kirk had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Slieve Kirk; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Slieve Kirk?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 25 January 2012.
- Where is Slieve Kirk?
- 8.7 km south of Derry, Co. Tyrone, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).