Solar · United Kingdom
Carrickatane
Operator ESB Solar NI
Planning Permission Expired4.1 MWData checked 16 November 2026Source record dated 24 January 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Carrickatane is a 4.1 MW solar farm 10 km south of Derry, Co. Derry / Londonderry, United Kingdom. Its planning application (LA11/2017/0089/F) went to Derry City and Strabane on 9 February 2017 and was granted on 21 November 2018. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 14 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Carrickatane changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 4.1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Planning Permission Expired
- Operator or applicant
- ESB Solar NI
- Location
- Killymallaght Road, Cullion, Limavady, Co Londonderry, Co. Derry / Londonderry, BT47 3UT, United Kingdom
- Planning authority
- Derry City and Strabane
- Planning application
- LA11/2017/0089/F
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LA11/2017/0089/F, with what the planning evidence pack adds for this site.
Every application in Derry City and Strabane · Alerts for applications and incidents near here
Timeline
- 9 February 2017 Planning application submitted
- 21 November 2018 Planning permission granted
- 21 November 2023 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Carrickatane. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Carrickatane had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Carrickatane; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Carrickatane?
- Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 24 January 2020.
- Where is Carrickatane?
- 10 km south of Derry, Co. Derry / Londonderry, United Kingdom (postcode BT47 3UT).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).