Solar · United Kingdom

Sinton End Farm, Acton Beauchamp - Solar Farm

Operator Sintons End Solar Farm Limited

Application Refused20 MWData checked 16 November 2026Source record dated 2 December 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Sinton End Farm, Acton Beauchamp - Solar Farm is a 20 MW solar farm 9.7 km west of Great Malvern, Herefordshire, United Kingdom. Its planning application (P243282/F) went to Herefordshire, County of on 22 July 2025 and was refused on 9 October 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 8 other energy sites within 10 km, 6 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

283 energy sites within 40 km for Sinton End Farm, Acton Beauchamp - Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Sintons End Solar Farm Limited
Location
Sinton End Farm, Acton Beauchamp, Worcester, Herefordshire, WR6 5AE, United Kingdom
Planning authority
Herefordshire, County of
Planning application
P243282/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P243282/F, with what the planning evidence pack adds for this site.

Every application in Herefordshire, County of · Alerts for applications and incidents near here

  • 22 July 2025 Planning application submitted
  • 9 October 2025 Planning permission refused

None found. The register holds no published incident that names Sinton End Farm, Acton Beauchamp - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Sinton End Farm, Acton Beauchamp - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Sinton End Farm, Acton Beauchamp - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Sinton End Farm, Acton Beauchamp - Solar Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2025.
Where is Sinton End Farm, Acton Beauchamp - Solar Farm?
9.7 km west of Great Malvern, Herefordshire, United Kingdom (postcode WR6 5AE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).