Frome Valley - Solar Farm

Operator Anesco · Owner Quanesco Midco Limited

Awaiting Construction20.6 MWData checked 16 November 2026Source record dated 27 February 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Frome Valley - Solar Farm is a 20.6 MW solar farm 10 km east of Hereford, United Kingdom. Its planning application (P241510/F) went to Herefordshire, County of on 13 June 2024 and was granted on 7 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 15 other energy sites within 10 km, 7 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Frome Valley - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2523, Suspected solar panel fault sparks roof fire at Ombersley home, 31 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home31 kmSignificant
EIR-15512019Fire involving solar panels on a garage roof in Shropshire32 kmMinor
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries60 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
20.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Anesco
Owner
Quanesco Midco Limited
Location
Yarkhill, Three Crosses, Stoke Edith, Herefordshire, HR1 3SX, United Kingdom
Planning authority
Herefordshire, County of
Planning application
P241510/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P241510/F, with what the planning evidence pack adds for this site.

Every application in Herefordshire, County of · Alerts for applications and incidents near here

  • 13 June 2024 Planning application submitted
  • 7 July 2025 Planning permission granted
  • 7 July 2028 Planning permission runs out

None found. The register holds no published incident that names Frome Valley - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Frome Valley - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Frome Valley - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Frome Valley - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 27 February 2026.
Where is Frome Valley - Solar Farm?
10 km east of Hereford, United Kingdom (postcode HR1 3SX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).