Battery storage · United Kingdom
Larport Farm Battery Storage (Larport Lane)
Operator GSES 1 LIMITED · Owner Gore Street Energy Storage Fund PLC
Operational20 MWData checked 16 November 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Larport Farm Battery Storage (Larport Lane) is a 20 MW battery storage site 6.4 km east of Hereford, United Kingdom. Its status in the public dataset is operational. There are 17 other energy sites within 10 km, 8 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Larport Farm Battery Storage (Larport Lane) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
GSES 1 LIMITED (11161391), active, since 2018. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Battery)
- Capacity
- 20 MW (the site, from its planning record)
- Capacity Market unit
- 14.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government); the unit figure from the Capacity Market register (EMR Delivery Body)
- Status
- Operational (Capacity Market unit, delivery year 2026, agreement awarded)
- Operator
- GSES 1 LIMITED
- Owner
- Gore Street Energy Storage Fund PLC
- Location
- HR1 4EP, United Kingdom
This record is a Capacity Market unit, and 14.3 MW is the figure entered in the auction. The planning record for this place, Land to the west of Clay Hill Pit / Larport Farm, gives 20 MW. Land to the west of Clay Hill Pit / Larport Farm
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Larport Farm Battery Storage (Larport Lane). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Larport Farm Battery Storage (Larport Lane) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Larport Farm Battery Storage (Larport Lane); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Larport Farm Battery Storage (Larport Lane)?
- Operational, in the public dataset.
- Where is Larport Farm Battery Storage (Larport Lane)?
- 6.4 km east of Hereford, United Kingdom (postcode HR1 4EP).
The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).