Planning pack for this site, £295Other options

Battery storage · United Kingdom

Green Spider Climbing, Ramsden Road - Micro Energy Storage Facility

Operator Aggregated Micro Power Holdings Plc · Owner Fossa Holdco Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 2 September 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Green Spider Climbing, Ramsden Road - Micro Energy Storage Facility is a 0.2 MW battery storage site on the edge of Hereford, United Kingdom. Its planning application (P241158/F) went to Herefordshire, County of on 14 May 2024 and was granted on 16 July 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 18 other energy sites within 10 km, 8 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

AGGREGATED MICRO POWER HOLDINGS LIMITED (08372177), active, since 2013. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Green Spider Climbing, Ramsden Road - Micro Energy Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 63 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire63 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool152 kmMajor
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter154 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Aggregated Micro Power Holdings Plc
Owner
Fossa Holdco Limited
Location
Green Spider Climbing Limited, Ramsden Road, Rotherwas, Hereford, Herefordshire, HR2 6LR, United Kingdom
Planning authority
Herefordshire, County of
Planning application
P241158/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P241158/F, with what the planning evidence pack adds for this site.

Every application in Herefordshire, County of · Alerts for applications and incidents near here

  • 14 May 2024 Planning application submitted
  • 16 July 2024 Planning permission granted
  • 16 July 2027 Planning permission runs out

None found. The register holds no published incident that names Green Spider Climbing, Ramsden Road - Micro Energy Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Green Spider Climbing, Ramsden Road - Micro Energy Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Green Spider Climbing, Ramsden Road - Micro Energy Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Green Spider Climbing, Ramsden Road - Micro Energy Storage Facility?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 September 2024.
Where is Green Spider Climbing, Ramsden Road - Micro Energy Storage Facility?
On the edge of Hereford, United Kingdom (postcode HR2 6LR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).