← Back to Dorset
Planning pack for this site, £295Other options

Solar · United Kingdom

Sainsburys, Alder Park - Solar panels

Operator Sainsburys Supermarkets Limited

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 18 June 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Sainsburys, Alder Park - Solar panels is a 0.3 MW solar farm on the edge of Parkstone, Dorset, United Kingdom. Its planning application (APP/24/01300/PA) went to Bournemouth, Christchurch and Poole on 26 November 2024 and was granted on 12 May 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 41 other energy sites within 10 km, 35 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Sainsburys, Alder Park - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1396, Solar panel fire leads to Travelodge evacuation in Poole, 3.0 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13962024Solar panel fire leads to Travelodge evacuation in Poole3.0 kmMinor
EIR-15162025Solar panels suspected in house roof fire in Ferndown6.7 kmSignificant
EIR-15322023Roof-space fire involving a solar inverter at a house in Ferndown7.2 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Sainsburys Supermarkets Limited
Location
Alder Park, 4 Alder Road, Poole, Dorset, BH12 4BA, United Kingdom
Planning authority
Bournemouth, Christchurch and Poole
Planning application
APP/24/01300/PA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/24/01300/PA, with what the planning evidence pack adds for this site.

Every application in Bournemouth, Christchurch and Poole · Alerts for applications and incidents near here

  • 26 November 2024 Planning application submitted
  • 12 May 2025 Planning permission granted

None found. The register holds no published incident that names Sainsburys, Alder Park - Solar panels. If you know of one, report it (confidential reports are anonymised).

Has Sainsburys, Alder Park - Solar panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Sainsburys, Alder Park - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Sainsburys, Alder Park - Solar panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 18 June 2025.
Where is Sainsburys, Alder Park - Solar panels?
On the edge of Parkstone, Dorset, United Kingdom (postcode BH12 4BA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).