Solar · United Kingdom
Waltham Point Distribution Centre
Operator Sainsburys Supermarkets Limited
Operational1.8 MWData checked 16 November 2026Source record dated 16 May 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Waltham Point Distribution Centre is a 1.8 MW solar farm in Waltham Abbey, Essex, United Kingdom. Its planning application went to Epping Forest. It has been operating since 5 February 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 50 other energy sites within 10 km, 40 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Waltham Point Distribution Centre changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Sainsburys Supermarkets Limited
- Location
- Fleming Road, Waltham Point, Essex, EN9 3BZ, United Kingdom
- Planning authority
- Epping Forest
- First operating
- 2016
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Epping Forest · Alerts for applications and incidents near here
Timeline
- 5 January 2016 Construction started
- 5 February 2016 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Waltham Point Distribution Centre. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Waltham Point Distribution Centre had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Waltham Point Distribution Centre; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Waltham Point Distribution Centre?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 May 2016.
- Where is Waltham Point Distribution Centre?
- In Waltham Abbey, Essex, United Kingdom (postcode EN9 3BZ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).