Battery storage · United Kingdom

Rusholme Grange

Operator Harmony Energy Storage · Owner Heit Rh Limited

Operational40 MWData checked 16 November 2026Source record dated 23 August 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Rusholme Grange is a 40 MW battery storage site 5 km north-west of Goole, North Yorkshire, United Kingdom. Its planning application (2021/0601/FUL) went to North Yorkshire on 26 May 2021 and was granted on 3 September 2021. It has been operating since 1 August 2024. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 50 other energy sites within 10 km, 24 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 14 other sites and 530 energy sites within 40 km for Rusholme Grange

Members see the sites and incidents around this one, and every record behind them.

HEIT RH LIMITED (13244588), active, since 2021. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
40 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Harmony Energy Storage
Owner
Heit Rh Limited
Location
Rusholme Grange, Rusholme Lane, Drax, Selby, North Yorkshire, YO8 8PW, United Kingdom
Planning authority
North Yorkshire
Planning application
2021/0601/FUL
First operating
2024

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2021/0601/FUL, with what the planning evidence pack adds for this site.

Every application in North Yorkshire · Alerts for applications and incidents near here

  • 26 May 2021 Planning application submitted
  • 3 September 2021 Planning permission granted
  • 1 January 2022 Construction started
  • 1 August 2024 Operational

None found. The register holds no published incident that names Rusholme Grange. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Rusholme Grange had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Rusholme Grange; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Rusholme Grange?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 August 2024.
Where is Rusholme Grange?
5 km north-west of Goole, North Yorkshire, United Kingdom (postcode YO8 8PW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).