← Back to Stirling

Onshore wind · United Kingdom

Rosehill Wind Turbines

Operator Green Cat Renewables · Owner Green Cat Holdco Limited

Operational2.4 MWData checked 16 November 2026Source record dated 16 February 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Rosehill Wind Turbines is a 2.4 MW wind farm 3.2 km north of Stenhousemuir, Stirling, United Kingdom. Its planning application (12/00708/FUL) went to Stirling on 31 October 2012 and was granted on appeal on 24 April 2014. It has been operating since 15 December 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 52 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 34 other sites and 433 energy sites within 40 km for Rosehill Wind Turbines

Members see the sites and incidents around this one, and every record behind them.

GREEN CAT RENEWABLES LIMITED (SC277156), active, since 2004. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
2.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Green Cat Renewables
Owner
Green Cat Holdco Limited
Location
Land Some 550 Metres East Of Rosehill Rosehill Road Tower Plean, Stirling, United Kingdom
Planning authority
Stirling
Planning application
12/00708/FUL
Appeal reference
13/00017/REF
First operating
2015
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 12/00708/FUL, with what the planning evidence pack adds for this site.

Every application in Stirling · Alerts for applications and incidents near here

  • 31 October 2012 Planning application submitted
  • 10 September 2013 Planning permission refused
  • 24 April 2014 Planning permission granted
  • 24 April 2014 Appeal granted
  • 15 May 2015 Construction started
  • 15 December 2015 Operational

None found. The register holds no published incident that names Rosehill Wind Turbines. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Rosehill Wind Turbines had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Rosehill Wind Turbines; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Rosehill Wind Turbines?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 February 2016.
Where is Rosehill Wind Turbines?
3.2 km north of Stenhousemuir, Stirling, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).