RAF Molesworth Wind Farm

Application Refused15 MWChecked 6 October 2026Last changed in the dataset 11 December 2014

Technology
Onshore wind
Capacity
15 MW
Status
Application Refused (Secretary of State - Refusal)
Operator or applicant
RWE Npower Renewables
Location
sw/o Raf Molesworth, Warren Lane, Bythorn, Huntingdon, Cambridgeshire, Cambridgeshire, PE28 0QU, United Kingdom
Planning authority
Huntingdonshire
Planning application
1200967FUL
Appeal reference
APP/H0520/A/13/2197548
Turbines
6

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 18 June 2012 Planning application submitted
  • 2 May 2014 Planning permission refused
  • 28 June 2014 Appeal lodged
  • 5 December 2014 Refused by the Secretary of State
  • 5 December 2014 Appeal refused

None found. The register holds no published incident that names RAF Molesworth Wind Farm. If you know of one, report it (confidential reports are anonymised).

The register holds 54 incidents at onshore wind farms in the United Kingdom, 22 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.

What fails at onshore wind farms

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.