Onshore wind · United Kingdom
Ellands Farm
Operator Enertrag Ltd
Application Refused18 MWData checked 16 November 2026Source record dated 6 April 2007
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Ellands Farm is a 18 MW wind farm 5.9 km south-east of Oundle, Northamptonshire, United Kingdom. Its planning application (EN/06/00292/FUL) went to North Northamptonshire on 20 February 2006 and was refused on 17 May 2006. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 7 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Ellands Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 18 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Enertrag Ltd
- Location
- Barnwell Road, Hemington, Peterborough, Northamptonshire, PE8 5QJ, United Kingdom
- Planning authority
- North Northamptonshire
- Planning application
- EN/06/00292/FUL
- Turbines
- 6
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for EN/06/00292/FUL, with what the planning evidence pack adds for this site.
Every application in North Northamptonshire · Alerts for applications and incidents near here
Timeline
- 20 February 2006 Planning application submitted
- 17 May 2006 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Ellands Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Ellands Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Ellands Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Ellands Farm?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 6 April 2007.
- Where is Ellands Farm?
- 5.9 km south-east of Oundle, Northamptonshire, United Kingdom (postcode PE8 5QJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).