Onshore wind · United Kingdom

Ellands Farm

Operator Enertrag Ltd

Application Refused18 MWData checked 16 November 2026Source record dated 6 April 2007

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ellands Farm is a 18 MW wind farm 5.9 km south-east of Oundle, Northamptonshire, United Kingdom. Its planning application (EN/06/00292/FUL) went to North Northamptonshire on 20 February 2006 and was refused on 17 May 2006. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 7 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

409 energy sites within 40 km for Ellands Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
18 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Enertrag Ltd
Location
Barnwell Road, Hemington, Peterborough, Northamptonshire, PE8 5QJ, United Kingdom
Planning authority
North Northamptonshire
Planning application
EN/06/00292/FUL
Turbines
6

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN/06/00292/FUL, with what the planning evidence pack adds for this site.

Every application in North Northamptonshire · Alerts for applications and incidents near here

  • 20 February 2006 Planning application submitted
  • 17 May 2006 Planning permission refused

None found. The register holds no published incident that names Ellands Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Ellands Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ellands Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Ellands Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 6 April 2007.
Where is Ellands Farm?
5.9 km south-east of Oundle, Northamptonshire, United Kingdom (postcode PE8 5QJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).