← Back to Essex
Planning pack for this site, £295Other options

Solar · United Kingdom

Prentice’s Farm- Solar Farm

Operator Anglo Renewables · Owner Mintridge Holdings No. 3 Limited

Revised25 MWData checked 16 November 2026Source record dated 24 May 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Prentice’s Farm- Solar Farm is a 25 MW solar farm 4.2 km south-east of Danbury, Essex, United Kingdom. Its planning application (23/00807/FULM) went to Maldon on 15 August 2023 and was refused on 1 February 2024. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 28 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

ANGLO RENEWABLES LTD (12551330), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Prentice’s Farm- Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1537, Garage fire from overheated solar batteries in South Woodham Ferrers, 5.9 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers5.9 kmMinor
EIR-15302023Electrical fault causes solar panel fire in Wickford house11 kmMinor
EIR-22232023Homeowners allege solar panel fault caused Tolleshunt Knights house fire16 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
25 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Anglo Renewables
Owner
Mintridge Holdings No. 3 Limited
Location
Sw/O The Warren, Hackmans Lane, Purleigh, Chelmsford, Essex, CM3 6RJ, United Kingdom
Planning authority
Maldon
Planning application
23/00807/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/00807/FULM, with what the planning evidence pack adds for this site.

Every application in Maldon · Alerts for applications and incidents near here

  • 15 August 2023 Planning application submitted
  • 1 February 2024 Planning permission refused

None found. The register holds no published incident that names Prentice’s Farm- Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Prentice’s Farm- Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Prentice’s Farm- Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Prentice’s Farm- Solar Farm?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 24 May 2024.
Where is Prentice’s Farm- Solar Farm?
4.2 km south-east of Danbury, Essex, United Kingdom (postcode CM3 6RJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).