Battery storage · United Kingdom

Lowlands Farm - Battery Storage

Operator Anglo Renewables · Owner Mintridge Holdings No. 3 Limited

Awaiting Construction50 MWData checked 16 November 2026Source record dated 12 September 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Lowlands Farm - Battery Storage is a 50 MW battery storage site on the edge of Bartley Green, West Midlands, United Kingdom. Its planning application (P22/1733) went to Dudley on 30 November 2022 and was granted on appeal on 4 September 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 61 other energy sites within 10 km, 16 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ANGLO RENEWABLES LTD (12551330), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Lowlands Farm - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 80 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire80 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells98 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool122 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
50 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Anglo Renewables
Owner
Mintridge Holdings No. 3 Limited
Location
adj to M5 Motorway, Lowlands Farm, Illey Lane, Halesowen, West Midlands, B62 0HJ, United Kingdom
Planning authority
Dudley
Planning application
P22/1733
Appeal reference
APP/C4615/W/24/3341383

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P22/1733, with what the planning evidence pack adds for this site.

Every application in Dudley · Alerts for applications and incidents near here

  • 30 November 2022 Planning application submitted
  • 27 September 2023 Planning permission refused
  • 25 March 2024 Appeal lodged
  • 4 September 2024 Appeal granted
  • 4 September 2027 Planning permission runs out

None found. The register holds no published incident that names Lowlands Farm - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Lowlands Farm - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lowlands Farm - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Lowlands Farm - Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 September 2024.
Where is Lowlands Farm - Battery Storage?
On the edge of Bartley Green, West Midlands, United Kingdom (postcode B62 0HJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).