Battery storage · United Kingdom

Maldon Hall

Operator Green Investment Group · Owner Maldon BESS Limited

Awaiting Construction40 MWData checked 16 November 2026Source record dated 23 December 2021

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Maldon Hall is a 40 MW battery storage site in Maldon, Essex, United Kingdom. Its planning application (17/01106/FUL) went to Maldon on 29 September 2017 and was granted on appeal on 13 May 2019. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 21 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

MALDON BESS LIMITED (13645088), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Maldon Hall sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 33 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction33 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire179 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells196 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
40 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Green Investment Group
Owner
Maldon BESS Limited
Location
Land North West Of Maldon Hall, Spital Road, Maldon, Essex, CM9 6D, United Kingdom
Planning authority
Maldon
Planning application
17/01106/FUL
Appeal reference
APP/X1545/W/18/3204562

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 17/01106/FUL, with what the planning evidence pack adds for this site.

Every application in Maldon · Alerts for applications and incidents near here

  • 29 September 2017 Planning application submitted
  • 15 December 2017 Planning permission refused
  • 14 January 2019 Appeal lodged
  • 13 May 2019 Planning permission granted
  • 13 May 2019 Appeal granted
  • 13 May 2022 Planning permission expired

None found. The register holds no published incident that names Maldon Hall. If you know of one, report it (confidential reports are anonymised).

Has Maldon Hall had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Maldon Hall; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Maldon Hall?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 December 2021.
Where is Maldon Hall?
In Maldon, Essex, United Kingdom (postcode CM9 6D).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).