Maldon Wycke Solar Farm

Operator Low Carbon UK

Operational25 MWData checked 16 November 2026Source record dated 30 October 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Maldon Wycke Solar Farm is a 25 MW solar farm 3.1 km south of Maldon, Essex, United Kingdom. Its planning application (22/00261/FUL) went to Maldon on 23 February 2022 and was granted on 8 August 2022. It has been operating since 1 October 2024. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 24 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

450 energy sites within 40 km for Maldon Wycke Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
25 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Low Carbon UK
Location
Hall Farm Land At, Hazeleigh Hall Lane, Hazeleigh, Maldon, Essex, CM9 6GT, United Kingdom
Planning authority
Maldon
Planning application
22/00261/FUL
First operating
2024

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/00261/FUL, with what the planning evidence pack adds for this site.

Every application in Maldon · Alerts for applications and incidents near here

  • 23 February 2022 Planning application submitted
  • 8 August 2022 Planning permission granted
  • 1 October 2024 Operational

None found. The register holds no published incident that names Maldon Wycke Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Maldon Wycke Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Maldon Wycke Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Maldon Wycke Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 30 October 2024.
Where is Maldon Wycke Solar Farm?
3.1 km south of Maldon, Essex, United Kingdom (postcode CM9 6GT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).