Onshore wind · Canada
Pohénégamook, Picard, Saint-Antonin, Wolastokuk wind farm
Owner Alliance de l'Énergie de l'Est; Invenergy LLC
Under construction641 MWData checked 8 October 2026Source record dated 12 March 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Pohénégamook, Picard, Saint-Antonin, Wolastokuk wind farm is a 641 MW wind farm 20 km south-east of Rivière-du-Loup, Quebec, Canada. It first operated in 2026. Its status in the Global Energy Monitor solar and wind trackers is under construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 25 incidents at wind farms in Canada, and 362 worldwide.
Get an email when Pohénégamook, Picard, Saint-Antonin, Wolastokuk wind farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in Canada. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pohénégamook, Picard, Saint-Antonin, Wolastokuk wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 25 comparable onshore wind incidents in Canada, nearest first. The nearest is EIR-2828, Canadian wind farm to replace 50 turbines after collapse probe, 239 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2828 | 2022 | Canadian wind farm to replace 50 turbines after collapse probe | 239 km | Major |
| EIR-0544 | 2024 | Company fined after worker fatality at Sussex wind farm construction site | 367 km | Major |
| EIR-1343 | 2026 | Worker dies after fall inside turbine at PPAW wind farm | 507 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 22 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 641 MW
- Capacity figure from
- Global Energy Monitor solar and wind trackers
- Status
- Under construction (Construction)
- Owner
- Alliance de l'Énergie de l'Est; Invenergy LLC
- Location
- Quebec, Canada
- First operating
- 2026
- Phases in the tracker
- 2
View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Pohénégamook, Picard, Saint-Antonin, Wolastokuk wind farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Pohénégamook, Picard, Saint-Antonin, Wolastokuk wind farm had a fire or other incident?
- None is on the register as of 22 November 2026. The register holds no published incident that names Pohénégamook, Picard, Saint-Antonin, Wolastokuk wind farm; it holds 25 incidents at wind farms in Canada.
- What is the status of Pohénégamook, Picard, Saint-Antonin, Wolastokuk wind farm?
- Under construction, in the Global Energy Monitor solar and wind trackers, where it last changed on 12 March 2025.
- Where is Pohénégamook, Picard, Saint-Antonin, Wolastokuk wind farm?
- 20 km south-east of Rivière-du-Loup, Quebec, Canada.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).