Pillswood Phase 2

Operator Harmony Energy Storage

Operational49.5 MWData checked 16 November 2026Source record dated 1 November 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Pillswood Phase 2 is a 49.5 MW battery storage site 4.9 km south of Beverley, Humberside, United Kingdom. Its planning application (19/01449/STPLF) went to East Riding of Yorkshire on 23 May 2019 and was granted on 25 July 2023. It has been operating since 1 November 2022. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 62 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 14 other sites and 393 energy sites within 40 km for Pillswood Phase 2

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Capacity
49.5 MW (this record)
All phases
99 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Harmony Energy Storage
Location
Creyke Beck Substation 4875, Park Lane, Cottingham, Humberside, Humberside, HU16 5SB, United Kingdom
Planning authority
East Riding of Yorkshire
Planning application
19/01449/STPLF
First operating
2022

This record is 49.5 MW, one part of a site built in phases. With Pillswood Phase 1 (49.5 MW) the phases on the register add up to 99 MW. Pillswood Phase 1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 19/01449/STPLF, with what the planning evidence pack adds for this site.

Every application in East Riding of Yorkshire · Alerts for applications and incidents near here

  • 23 May 2019 Planning application submitted
  • 1 April 2022 Construction started
  • 1 November 2022 Operational
  • 25 July 2023 Planning permission granted

None found. The register holds no published incident that names Pillswood Phase 2. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Pillswood Phase 2 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pillswood Phase 2; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Pillswood Phase 2?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 November 2022.
Where is Pillswood Phase 2?
4.9 km south of Beverley, Humberside, United Kingdom (postcode HU16 5SB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).