Solar · United Kingdom

Pierces Farm

Operator NextEnergy Capital

Operational1.7 MWData checked 16 November 2026Source record dated 4 July 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pierces Farm is a 1.7 MW solar farm 4.9 km south-east of Calcot, Berkshire, United Kingdom. Its planning application (13/03187/COMIND) went to West Berkshire on 23 December 2013 and was granted on 19 March 2014. It has been operating since 15 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 65 other energy sites within 10 km, 38 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 2 other sites and 453 energy sites within 40 km for Pierces Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
1.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
NextEnergy Capital
Location
Land North Of Goring Lane, Grazeley, Reading, Berkshire, Berkshire, United Kingdom
Planning authority
West Berkshire
Planning application
13/03187/COMIND
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 13/03187/COMIND, with what the planning evidence pack adds for this site.

Every application in West Berkshire · Alerts for applications and incidents near here

  • 23 December 2013 Planning application submitted
  • 19 March 2014 Planning permission granted
  • 16 October 2014 Construction started
  • 15 March 2015 Operational

None found. The register holds no published incident that names Pierces Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Pierces Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pierces Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Pierces Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 July 2018.
Where is Pierces Farm?
4.9 km south-east of Calcot, Berkshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).