Battery storage · United Kingdom

Wyld Meadow Farm - Battery energy storage

Operator NextEnergy Capital

Awaiting ConstructionData checked 16 November 2026Source record dated 25 May 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Wyld Meadow Farm - Battery energy storage is a battery storage site 4.8 km east of Axminster, Dorset, United Kingdom. Its planning application (P/FUL/2022/02658) went to Dorset on 17 May 2022 and was granted on 27 July 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 28 other energy sites within 10 km, 16 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wyld Meadow Farm - Battery energy storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 39 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter39 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire125 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction246 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
NextEnergy Capital
Location
Wyld Meadow Farm Pound Lane Monkton Wyld Bridport, Dorset, DT6 6DD, United Kingdom
Planning authority
Dorset
Planning application
P/FUL/2022/02658

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/FUL/2022/02658, with what the planning evidence pack adds for this site.

Every application in Dorset · Alerts for applications and incidents near here

  • 17 May 2022 Planning application submitted
  • 27 July 2022 Planning permission granted
  • 27 July 2025 Planning permission expired

None found. The register holds no published incident that names Wyld Meadow Farm - Battery energy storage. If you know of one, report it (confidential reports are anonymised).

Has Wyld Meadow Farm - Battery energy storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wyld Meadow Farm - Battery energy storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wyld Meadow Farm - Battery energy storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 May 2022.
Where is Wyld Meadow Farm - Battery energy storage?
4.8 km east of Axminster, Dorset, United Kingdom (postcode DT6 6DD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).