Battery storage · United Kingdom

Bloomfield Hatch Farm - Solar Farm & Battery

Operator Horizon Power & Energy Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 3 June 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Bloomfield Hatch Farm - Solar Farm & Battery is a battery storage site 6.4 km south of Calcot, Berkshire, United Kingdom. Its planning application (22/01330/REG3) went to West Berkshire on 31 May 2022 and was granted on 2 September 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 65 other energy sites within 10 km, 18 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bloomfield Hatch Farm - Solar Farm & Battery sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 73 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire73 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction100 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter186 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Horizon Power & Energy Limited
Location
Bloomfield Hatch Farm Bloomfield Hatch Mortimer Reading, Berkshire, RG7 3AD, United Kingdom
Planning authority
West Berkshire
Planning application
22/01330/REG3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/01330/REG3, with what the planning evidence pack adds for this site.

Every application in West Berkshire · Alerts for applications and incidents near here

  • 31 May 2022 Planning application submitted
  • 2 September 2022 Planning permission granted
  • 2 September 2025 Planning permission expired

None found. The register holds no published incident that names Bloomfield Hatch Farm - Solar Farm & Battery. If you know of one, report it (confidential reports are anonymised).

Has Bloomfield Hatch Farm - Solar Farm & Battery had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bloomfield Hatch Farm - Solar Farm & Battery; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bloomfield Hatch Farm - Solar Farm & Battery?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 3 June 2025.
Where is Bloomfield Hatch Farm - Solar Farm & Battery?
6.4 km south of Calcot, Berkshire, United Kingdom (postcode RG7 3AD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).