Bloomfield Hatch Farm - Solar Farm & Battery is a battery storage site 6.4 km south of Calcot, Berkshire, United Kingdom. Its planning application (22/01330/REG3) went to West Berkshire on 31 May 2022 and was granted on 2 September 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 65 other energy sites within 10 km, 18 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Bloomfield Hatch Farm - Solar Farm & Battery changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bloomfield Hatch Farm - Solar Farm & Battery sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 73 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 73 km | Significant |
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 100 km | Significant |
| EIR-0249 | 2026 | Smoke and fire incident at Battery Box, Pinhoe Road, Exeter | 186 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Co-located with RE)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Horizon Power & Energy Limited
- Location
- Bloomfield Hatch Farm Bloomfield Hatch Mortimer Reading, Berkshire, RG7 3AD, United Kingdom
- Planning authority
- West Berkshire
- Planning application
- 22/01330/REG3
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 22/01330/REG3, with what the planning evidence pack adds for this site.
Every application in West Berkshire · Alerts for applications and incidents near here
Timeline
- 31 May 2022 Planning application submitted
- 2 September 2022 Planning permission granted
- 2 September 2025 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Bloomfield Hatch Farm - Solar Farm & Battery. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Bloomfield Hatch Farm - Solar Farm & Battery had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bloomfield Hatch Farm - Solar Farm & Battery; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Bloomfield Hatch Farm - Solar Farm & Battery?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 3 June 2025.
- Where is Bloomfield Hatch Farm - Solar Farm & Battery?
- 6.4 km south of Calcot, Berkshire, United Kingdom (postcode RG7 3AD).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).