Onshore wind · United Kingdom

Pen Y Cymoedd

Operator Vattenfall (previously Nuon Renewables)

Operational228 MWData checked 16 November 2026Source record dated 4 June 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pen Y Cymoedd is a 228 MW wind farm 5.8 km north-west of Maesteg, Neath Port Talbot, United Kingdom. Its planning application (P2009/1053) went to Neath Port Talbot on 19 November 2009 and was granted on 18 November 2011. It has been operating since 19 May 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 32 other energy sites within 10 km, 17 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

334 energy sites within 40 km for Pen Y Cymoedd

Members see the sites and incidents around this one, and every record behind them.

7 Oct4 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

30 settled days to 4 Nov: 36,464 MWh, running 95% of half hours, peak 111 MW of 228, load factor 22%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £177,684 at its earnings over the last 30 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Onshore wind
Capacity
228 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Vattenfall (previously Nuon Renewables)
Location
Land stretches from the Upper Afan Valley to end of Cynon Valley., Neath Port Talbot, United Kingdom
Planning authority
Neath Port Talbot
Planning application
P2009/1053
First operating
2017
Turbines
76

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P2009/1053, with what the planning evidence pack adds for this site.

Every application in Neath Port Talbot · Alerts for applications and incidents near here

  • 19 November 2009 Planning application submitted
  • 18 November 2011 Planning permission granted
  • 6 February 2014 Construction started
  • 19 May 2017 Operational

None found. The register holds no published incident that names Pen Y Cymoedd. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Pen Y Cymoedd had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pen Y Cymoedd; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Pen Y Cymoedd?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 June 2018.
Where is Pen Y Cymoedd?
5.8 km north-west of Maesteg, Neath Port Talbot, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).