Solar · United Kingdom

Foel Fawr

Operator Marcol Afan Energy

Planning Permission Expired5.1 MWData checked 16 November 2026Source record dated 9 June 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Foel Fawr is a 5.1 MW solar farm 3.8 km north of Maesteg, Mid Glamorgan, United Kingdom. Its planning application (P/14/543/FUL) went to Bridgend on 15 August 2014 and was granted on appeal on 22 April 2016. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 28 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

382 energy sites within 40 km for Foel Fawr

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5.1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Marcol Afan Energy
Location
LAND NORTH BRYNHEULOG CAERAU PARK MAESTEG BRIDGEND, Mid Glamorgan, CF34 0YH, United Kingdom
Planning authority
Bridgend
Planning application
P/14/543/FUL
Appeal reference
APP/F6915/A/15/3133430

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/14/543/FUL, with what the planning evidence pack adds for this site.

Every application in Bridgend · Alerts for applications and incidents near here

  • 15 August 2014 Planning application submitted
  • 12 June 2015 Planning permission refused
  • 24 November 2015 Appeal lodged
  • 22 April 2016 Planning permission granted
  • 22 April 2016 Appeal granted
  • 22 April 2021 Planning permission expired

None found. The register holds no published incident that names Foel Fawr. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Foel Fawr had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Foel Fawr; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Foel Fawr?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 9 June 2020.
Where is Foel Fawr?
3.8 km north of Maesteg, Mid Glamorgan, United Kingdom (postcode CF34 0YH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).