Battery storage · United Kingdom
Park Farm
Operator Eco-Economix
Planning Permission Expired10 MWData checked 16 November 2026Source record dated 12 April 2021
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Park Farm is a 10 MW battery storage site 3.8 km north-east of Royal Wootton Bassett, Wiltshire, United Kingdom. Its planning application (18/00952/FUL) went to Wiltshire on 9 March 2018 and was granted on 3 May 2018. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 60 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Park Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 10 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Planning Permission Expired
- Operator or applicant
- Eco-Economix
- Location
- Park Farm, Hook Street, Lydiard Tregoze, Swindon, Wiltshire, Wiltshire, SN5 3NY, United Kingdom
- Planning authority
- Wiltshire
- Planning application
- 18/00952/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 18/00952/FUL, with what the planning evidence pack adds for this site.
Every application in Wiltshire · Alerts for applications and incidents near here
Timeline
- 9 March 2018 Planning application submitted
- 3 May 2018 Planning permission granted
- 3 May 2021 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Park Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Park Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Park Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Park Farm?
- Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 12 April 2021.
- Where is Park Farm?
- 3.8 km north-east of Royal Wootton Bassett, Wiltshire, United Kingdom (postcode SN5 3NY).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).