← Back to Wiltshire

Energy sites / United Kingdom / Wiltshire

Solar · United Kingdom

Rivermead Drive, Rivermead Industrial Estate - Solar Panels

Awaiting Construction0.2 MWChecked 6 October 2026Last changed in the dataset 15 November 2022

Technology
Solar
Capacity
0.2 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Uni-Mill Engineering Limited
Location
Unit H Rivermead Drive Rivermead Industrial Estate, Wiltshire, SN5 7EX, United Kingdom
Planning authority
Swindon
Planning application
S/PSOLP/22/1429

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 14 September 2022 Planning application submitted
  • 9 November 2022 Planning permission granted

None found. The register holds no published incident that names Rivermead Drive, Rivermead Industrial Estate - Solar Panels. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack sets out every comparable incident for one project, with sources. £295, by email in minutes.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.