Rivermead Drive, Rivermead Industrial Estate - Solar Panels

Operator Uni-Mill Engineering Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 15 November 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Rivermead Drive, Rivermead Industrial Estate - Solar Panels is a 0.2 MW solar farm 3.2 km west of Swindon, Wiltshire, United Kingdom. Its planning application (S/PSOLP/22/1429) went to Swindon on 14 September 2022 and was granted on 9 November 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 67 other energy sites within 10 km, 48 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Rivermead Drive, Rivermead Industrial Estate - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2109, Solar installer falls through fragile farm roof at Kemble, suffering brain injuries, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries18 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire18 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol53 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Uni-Mill Engineering Limited
Location
Unit H Rivermead Drive Rivermead Industrial Estate, Wiltshire, SN5 7EX, United Kingdom
Planning authority
Swindon
Planning application
S/PSOLP/22/1429

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/PSOLP/22/1429, with what the planning evidence pack adds for this site.

Every application in Swindon · Alerts for applications and incidents near here

  • 14 September 2022 Planning application submitted
  • 9 November 2022 Planning permission granted

None found. The register holds no published incident that names Rivermead Drive, Rivermead Industrial Estate - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Rivermead Drive, Rivermead Industrial Estate - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Rivermead Drive, Rivermead Industrial Estate - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Rivermead Drive, Rivermead Industrial Estate - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 November 2022.
Where is Rivermead Drive, Rivermead Industrial Estate - Solar Panels?
3.2 km west of Swindon, Wiltshire, United Kingdom (postcode SN5 7EX).