← Back to Wiltshire

Battery storage · United Kingdom

Mannington Battery Storage Plant

Operator Still Waters Green Technology · Owner Sw Mannington Limited

Operational49.9 MWData checked 16 November 2026Source record dated 14 September 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Mannington Battery Storage Plant is a 49.9 MW battery storage site on the edge of Swindon, Wiltshire, United Kingdom. Its planning application (S/17/1879) went to Swindon on 21 November 2017 and was granted on 7 December 2018. It has been operating since 1 October 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 64 other energy sites within 10 km, 12 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

338 energy sites within 40 km for Mannington Battery Storage Plant

Members see the sites and incidents around this one, and every record behind them.

SW MANNINGTON LIMITED (12268599), active, since 2019. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Still Waters Green Technology
Owner
Sw Mannington Limited
Location
Mannington Depot Telford Way, Service Road, Mannington, Swindon, Wiltshire, Wiltshire, SN5 8WA, United Kingdom
Planning authority
Swindon
Planning application
S/17/1879
First operating
2021

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/17/1879, with what the planning evidence pack adds for this site.

Every application in Swindon · Alerts for applications and incidents near here

  • 21 November 2017 Planning application submitted
  • 7 December 2018 Planning permission granted
  • 1 November 2020 Construction started
  • 1 October 2021 Operational

None found. The register holds no published incident that names Mannington Battery Storage Plant. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Mannington Battery Storage Plant had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mannington Battery Storage Plant; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Mannington Battery Storage Plant?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 September 2022.
Where is Mannington Battery Storage Plant?
On the edge of Swindon, Wiltshire, United Kingdom (postcode SN5 8WA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).