← Back to Wiltshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Studley Grange Farm, Studley - Solar Farm

Operator Studley Grange Garden & Leisure Park

Application Submitted2.2 MWData checked 16 November 2026Source record dated 8 May 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Studley Grange Farm, Studley - Solar Farm is a 2.2 MW solar farm 3.9 km north-west of Wroughton, Wiltshire, United Kingdom. Its planning application (PL/2026/02160) went to Wiltshire on 20 April 2026. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 52 other energy sites within 10 km, 35 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Studley Grange Farm, Studley - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2109, Solar installer falls through fragile farm roof at Kemble, suffering brain injuries, 19 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries19 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire20 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol51 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
2.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Studley Grange Garden & Leisure Park
Location
Studley Grange Farm, Studley, Swindon, Wiltshire, SN4 9QT, United Kingdom
Planning authority
Wiltshire
Planning application
PL/2026/02160

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2026/02160, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

  • 20 April 2026 Planning application submitted

None found. The register holds no published incident that names Studley Grange Farm, Studley - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Studley Grange Farm, Studley - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Studley Grange Farm, Studley - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Studley Grange Farm, Studley - Solar Farm?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 8 May 2026.
Where is Studley Grange Farm, Studley - Solar Farm?
3.9 km north-west of Wroughton, Wiltshire, United Kingdom (postcode SN4 9QT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).