Solar · United Kingdom

Park Farm

Operator Low Carbon Solar

Operational4 MWData checked 16 November 2026Source record dated 14 June 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Park Farm is a 4 MW solar farm 5.3 km south-east of Manston, Dorset, United Kingdom. Its planning application (2/2011/0304/PLNG) went to Dorset on 22 March 2011 and was granted on 4 May 2011. It has been operating since 2 March 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 7 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 4 other sites and 291 energy sites within 40 km for Park Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Low Carbon Solar
Location
Iwerne Minster, Blandford Forum, Dorset, DT11 8TP, United Kingdom
Planning authority
Dorset
Planning application
2/2011/0304/PLNG
First operating
2013

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2/2011/0304/PLNG, with what the planning evidence pack adds for this site.

Every application in Dorset · Alerts for applications and incidents near here

  • 22 March 2011 Planning application submitted
  • 4 May 2011 Planning permission granted
  • 1 August 2011 Construction started
  • 2 March 2013 Operational

None found. The register holds no published incident that names Park Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Park Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Park Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Park Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 June 2013.
Where is Park Farm?
5.3 km south-east of Manston, Dorset, United Kingdom (postcode DT11 8TP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).