Solar · United Kingdom
Stour Row Solar Farm
Operator Allied Renewables
Planning Permission Expired12 MWData checked 16 November 2026Source record dated 10 October 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Stour Row Solar Farm is a 12 MW solar farm 3.8 km north of Manston, Dorset, United Kingdom. Its planning application (2/2011/0713/PLNG) went to Dorset on 7 June 2011 and was granted on 24 August 2011. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 20 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Stour Row Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 12 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Planning Permission Expired
- Operator or applicant
- Allied Renewables
- Location
- Land At St (E) 382383 (N) 120456 Stour Row Shaftesbury Dorset, Dorset, SP7 0QD, United Kingdom
- Planning authority
- Dorset
- Planning application
- 2/2011/0713/PLNG
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2/2011/0713/PLNG, with what the planning evidence pack adds for this site.
Every application in Dorset · Alerts for applications and incidents near here
Timeline
- 7 June 2011 Planning application submitted
- 24 August 2011 Planning permission granted
- 23 August 2014 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Stour Row Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Stour Row Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Stour Row Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Stour Row Solar Farm?
- Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 10 October 2016.
- Where is Stour Row Solar Farm?
- 3.8 km north of Manston, Dorset, United Kingdom (postcode SP7 0QD).