← Back to Essex

Solar · United Kingdom

Ongar Landfill Ground mounted solar photovoltaic

Operator Infinis · Owner Infinis Energy Management Limited

Application Withdrawn8.8 MWData checked 16 November 2026Source record dated 3 May 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ongar Landfill Ground mounted solar photovoltaic is a 8.8 MW solar farm 8.8 km north-west of Shenfield, Essex, United Kingdom. Its planning application (ESS/21/21/BRW) went to Brentwood on 22 February 2021 and was withdrawn on 21 September 2021. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 10 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 4 other sites and 711 energy sites within 40 km for Ongar Landfill Ground mounted solar photovoltaic

Members see the sites and incidents around this one, and every record behind them.

INFINIS LIMITED (05719060), active, since 2006. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
8.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Infinis
Owner
Infinis Energy Management Limited
Location
Ongar Landfill, Mill Lane, High Ongar, Essex, CM5 9RG, United Kingdom
Planning authority
Brentwood
Planning application
ESS/21/21/BRW

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ESS/21/21/BRW, with what the planning evidence pack adds for this site.

Every application in Brentwood · Alerts for applications and incidents near here

  • 22 February 2021 Planning application submitted
  • 21 September 2021 Application withdrawn

None found. The register holds no published incident that names Ongar Landfill Ground mounted solar photovoltaic. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Ongar Landfill Ground mounted solar photovoltaic had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ongar Landfill Ground mounted solar photovoltaic; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Ongar Landfill Ground mounted solar photovoltaic?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 3 May 2022.
Where is Ongar Landfill Ground mounted solar photovoltaic?
8.8 km north-west of Shenfield, Essex, United Kingdom (postcode CM5 9RG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).