Bishampton Solar Farm

Operator Infinis · Owner Infinis Energy Management Limited

Under Construction30 MWData checked 16 November 2026Source record dated 7 April 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Bishampton Solar Farm is a 30 MW solar farm 7.5 km north-east of Pershore, Worcestershire, United Kingdom. Its planning application (20/02071/FUL) went to Wychavon on 13 October 2020 and was granted on 5 November 2021. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 22 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

INFINIS LIMITED (05719060), active, since 2006. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bishampton Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2523, Suspected solar panel fault sparks roof fire at Ombersley home, 20 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home20 kmSignificant
EIR-12722022Fire in solar panel distribution board at Birmingham college36 kmMinor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire50 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
30 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Infinis
Owner
Infinis Energy Management Limited
Location
Solar Farm, Broad Lane, Bishampton, Pershore, Worcestershire, WR10 2NF, United Kingdom
Planning authority
Wychavon
Planning application
20/02071/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/02071/FUL, with what the planning evidence pack adds for this site.

Every application in Wychavon · Alerts for applications and incidents near here

  • 13 October 2020 Planning application submitted
  • 5 November 2021 Planning permission granted
  • 2 June 2024 Planning permission expired

None found. The register holds no published incident that names Bishampton Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Bishampton Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bishampton Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bishampton Solar Farm?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 April 2021.
Where is Bishampton Solar Farm?
7.5 km north-east of Pershore, Worcestershire, United Kingdom (postcode WR10 2NF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).