Onshore wind · United Kingdom
Lenchwick
Operator Scottish Power Renewables
Application Refused11.5 MWData checked 16 November 2026Source record dated 24 November 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Lenchwick is a 11.5 MW wind farm 6.3 km north of Evesham, Hereford and Worcester, United Kingdom. Its planning application (10/01074) went to Wychavon on 4 May 2010 and was refused on 31 January 2011. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 24 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Lenchwick changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 11.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Scottish Power Renewables
- Location
- Land East of Bishampton Bank, Sheriffs Lench, Hereford and Worcester, United Kingdom
- Planning authority
- Wychavon
- Planning application
- 10/01074
- Turbines
- 5
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 10/01074, with what the planning evidence pack adds for this site.
Every application in Wychavon · Alerts for applications and incidents near here
Timeline
- 4 May 2010 Planning application submitted
- 31 January 2011 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Lenchwick. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Lenchwick had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Lenchwick; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Lenchwick?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 24 November 2015.
- Where is Lenchwick?
- 6.3 km north of Evesham, Hereford and Worcester, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).