Battery storage · United Kingdom
Thrift Solar Farm and BESS
Operator IB Vogt UK Limited
Awaiting Construction30 MWData checked 16 November 2026Source record dated 13 January 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Thrift Solar Farm and BESS is a 30 MW battery storage site 4 km east of Epping, Essex, United Kingdom. Its planning application (EPF/1216/25) went to Epping Forest on 23 June 2025 and was granted on 24 December 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 12 other energy sites within 10 km. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Thrift Solar Farm and BESS changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
IB VOGT UK LTD (06451452), active, since 2007. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Thrift Solar Farm and BESS sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 29 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 29 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 145 km | Significant |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 181 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Co-located with RE)
- Capacity
- 30 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- IB Vogt UK Limited
- Location
- E/O Tawney Common, Theydon Mount, Epping, Essex, CM16 7PU, United Kingdom
- Planning authority
- Epping Forest
- Planning application
- EPF/1216/25
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for EPF/1216/25, with what the planning evidence pack adds for this site.
Every application in Epping Forest · Alerts for applications and incidents near here
Timeline
- 23 June 2025 Planning application submitted
- 24 December 2025 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Thrift Solar Farm and BESS. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Thrift Solar Farm and BESS had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Thrift Solar Farm and BESS; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Thrift Solar Farm and BESS?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 January 2026.
- Where is Thrift Solar Farm and BESS?
- 4 km east of Epping, Essex, United Kingdom (postcode CM16 7PU).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).