Planning pack for this site, £295Other options

Battery storage · United Kingdom

Newnham Road, Newnham - Battery Energy Storage

Operator Balance Power Projects Limited · Owner Balance Energy 5 LTD

Awaiting ConstructionData checked 16 November 2026Source record dated 15 July 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Newnham Road, Newnham - Battery Energy Storage is a battery storage site 3.2 km north of Baldock, Hertfordshire, United Kingdom. Its planning application (24/02713/FP) went to North Hertfordshire on 12 December 2024 and was granted on 25 June 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 25 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Newnham Road, Newnham - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 72 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction72 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire124 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells138 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Balance Power Projects Limited
Owner
Balance Energy 5 LTD
Location
Newnham Road, Newnham, Baldock, Hertfordshire, SG7 5DP, United Kingdom
Planning authority
North Hertfordshire
Planning application
24/02713/FP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/02713/FP, with what the planning evidence pack adds for this site.

Every application in North Hertfordshire · Alerts for applications and incidents near here

  • 12 December 2024 Planning application submitted
  • 25 June 2025 Planning permission granted
  • 25 June 2028 Planning permission runs out

None found. The register holds no published incident that names Newnham Road, Newnham - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Newnham Road, Newnham - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Newnham Road, Newnham - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Newnham Road, Newnham - Battery Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 July 2025.
Where is Newnham Road, Newnham - Battery Energy Storage?
3.2 km north of Baldock, Hertfordshire, United Kingdom (postcode SG7 5DP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).