Battery storage · United Kingdom

South Staffordshire Railway Walk, Castlecroft - Battery Storage

Operator Balance Power Projects Limited · Owner Care Power (Wolverhampton) Limited

Awaiting Construction50 MWData checked 16 November 2026Source record dated 25 August 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

South Staffordshire Railway Walk, Castlecroft - Battery Storage is a 50 MW battery storage site 4.1 km north of Wombourne, West Midlands, United Kingdom. Its planning application (21/00440/FUL) went to South Staffordshire on 14 May 2021 and was granted on appeal on 16 August 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 73 other energy sites within 10 km, 31 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for South Staffordshire Railway Walk, Castlecroft - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 94 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells94 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire97 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool104 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
50 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Balance Power Projects Limited
Owner
Care Power (Wolverhampton) Limited
Location
South Staffordshire Railway Walk, Castlecroft Road, Castlecroft, Wolverhampton, West Midlands, WV4 4XX, United Kingdom
Planning authority
South Staffordshire
Planning application
21/00440/FUL
Appeal reference
APP/C3430/W/22/3292837

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/00440/FUL, with what the planning evidence pack adds for this site.

Every application in South Staffordshire · Alerts for applications and incidents near here

  • 14 May 2021 Planning application submitted
  • 23 December 2021 Planning permission refused
  • 12 April 2022 Appeal lodged
  • 16 August 2022 Planning permission granted
  • 16 August 2022 Appeal granted
  • 16 August 2025 Planning permission expired

None found. The register holds no published incident that names South Staffordshire Railway Walk, Castlecroft - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has South Staffordshire Railway Walk, Castlecroft - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names South Staffordshire Railway Walk, Castlecroft - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of South Staffordshire Railway Walk, Castlecroft - Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 August 2022.
Where is South Staffordshire Railway Walk, Castlecroft - Battery Storage?
4.1 km north of Wombourne, West Midlands, United Kingdom (postcode WV4 4XX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).