North Tawton Primary Substation - Battery Storage

Operator Balance Power Projects Limited · Owner Care Power (North Tawton) Limited

Awaiting Construction30 MWData checked 16 November 2026Source record dated 29 November 2021

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

North Tawton Primary Substation - Battery Storage is a 30 MW battery storage site 9 km north-east of Okehampton, Devon, United Kingdom. Its planning application (2094/21/FUL) went to West Devon on 7 June 2021 and was granted on 3 November 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 15 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

22 Oct20 Nov
WholesaleBalancing mechanismQuick ReserveDynamic ModerationDynamic Regulation

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

30 settled days to 7 Nov: 765 MWh out and 862 MWh in, active 70% of half hours, peak 15 MW of 30. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £3,671 at its earnings over the last 31 settled days (wholesale and response and reserve together). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for North Tawton Primary Substation - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 31 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter31 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire172 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool297 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
30 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Balance Power Projects Limited
Owner
Care Power (North Tawton) Limited
Location
S/O North Tawton Primary Substation, North Tawton, Devon, EX20 2DA, United Kingdom
Planning authority
West Devon
Planning application
2094/21/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2094/21/FUL, with what the planning evidence pack adds for this site.

Every application in West Devon · Alerts for applications and incidents near here

  • 7 June 2021 Planning application submitted
  • 3 November 2021 Planning permission granted
  • 3 November 2024 Planning permission expired

None found. The register holds no published incident that names North Tawton Primary Substation - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has North Tawton Primary Substation - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names North Tawton Primary Substation - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of North Tawton Primary Substation - Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 November 2021.
Where is North Tawton Primary Substation - Battery Storage?
9 km north-east of Okehampton, Devon, United Kingdom (postcode EX20 2DA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).