Battery storage · United Kingdom
North Tawton Primary Substation - Battery Storage
Operator Balance Power Projects Limited · Owner Care Power (North Tawton) Limited
Awaiting Construction30 MWData checked 16 November 2026Source record dated 29 November 2021
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
North Tawton Primary Substation - Battery Storage is a 30 MW battery storage site 9 km north-east of Okehampton, Devon, United Kingdom. Its planning application (2094/21/FUL) went to West Devon on 7 June 2021 and was granted on 3 November 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 15 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when North Tawton Primary Substation - Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
30 settled days to 7 Nov: 765 MWh out and 862 MWh in, active 70% of half hours, peak 15 MW of 30. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.
A day out costs this site about £3,671 at its earnings over the last 31 settled days (wholesale and response and reserve together). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for North Tawton Primary Substation - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 31 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0249 | 2026 | Smoke and fire incident at Battery Box, Pinhoe Road, Exeter | 31 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 172 km | Significant |
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 297 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 30 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Balance Power Projects Limited
- Owner
- Care Power (North Tawton) Limited
- Location
- S/O North Tawton Primary Substation, North Tawton, Devon, EX20 2DA, United Kingdom
- Planning authority
- West Devon
- Planning application
- 2094/21/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2094/21/FUL, with what the planning evidence pack adds for this site.
Every application in West Devon · Alerts for applications and incidents near here
Timeline
- 7 June 2021 Planning application submitted
- 3 November 2021 Planning permission granted
- 3 November 2024 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names North Tawton Primary Substation - Battery Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has North Tawton Primary Substation - Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names North Tawton Primary Substation - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of North Tawton Primary Substation - Battery Storage?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 November 2021.
- Where is North Tawton Primary Substation - Battery Storage?
- 9 km north-east of Okehampton, Devon, United Kingdom (postcode EX20 2DA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).